Friday, 9 April 2021

Singapore Rail Corridor - from Choa Chu Kang to Rail Mall part 2/6 (Apr 2021)

 From the junction of Choa Chu Kang North 5, North 6 and Choa Chu Kang Link:

Cross the road junction to the other side


Pang Sua park connector is on the right of the rail corridor

Public car park

Some works being done on the surrounding area

Approaching Kranji expressway

Linking works

Rail corridor runs under Kranji expressway

Jurong Pioneer JC on the right

Proper path to Bt Panjang (left) and Choa Chu Kang (right)...

...to Choa Chu Kang, Teck Whye Sec School in blue

 To Bt Panjang, Senja

Approaching Junction Ten (on the left)

Use the main road

In front of the construction office...
                                        
...is the rail corridor

Abandoned building

Murugan Hill temple

Can take a bus if you want to break the walk

Approaching Gombak Dr. The STOP sign is meant for the train operator

Use the traffic light crossing


A camp on the right


Some construction works

The rail corridor is on higher ground

The rail corridor is on higher ground


Closure of short length of rail corridor for re-development 


Use the main road to go to Hillview, Rail Mall

The barricade is just in front of CHIJ


The path to continue with the rail corridor is behind this bus stop



2 comments: